Shoalhaven Sewer Mains (SP2 & SP3)

Ironbuilt Infrastructure is delivering a 2.5km sewer main package in South Nowra for Shoalhaven City Council. Working through a constrained brownfield corridor, the team is managing challenging ground conditions, live traffic and active stakeholder coordination across the full length of the alignment.

This is a technically demanding project in a live urban environment – hard rock, groundwater and existing services all present throughout the works.

Scope of works includes:

  • Excavation through hard rock and challenging ground conditions
  • Continuous dewatering and groundwater control
  • Installation of new sewer mains and connections
  • Live traffic management and staging
  • Stakeholder coordination throughout the works corridor
  • Site testing, remediation and commissioning

The Shoalhaven Sewer Mains project demonstrates Ironbuilt’s capability to deliver complex sewer infrastructure in brownfield urban environments – managing hard rock excavation, dewatering and live service coordination simultaneously while maintaining programme and minimising disruption to the surrounding community.

Location

South Nowra, NSW

Project Status

Ongoing

Project Manager

Rhys Kelly

Project Engineer

Binish Johnny

Site Supervisor

Brendan Nicole